Data Centre, Total Area: 56,000m², Power Allowance: 80mwe, Resilience: Tier III

Location:

Greater London, UK

  • 80 MVA maximum site demand
  • 57.6 MVA maximum site IT load
  • 2 No. 28,000m² data centre buildings
  • 24 No. 930m² data halls, 12 No. per building
  • IT load density of 2.5 kW/m² per data hall
  • Maximum IT load of 2,400 kW (2.4 MW) per data hall
  • Designed to the principles of UTI Tier III

The building’s general arrangement will predominantly comprise:

GROUND FLOOR

Electrical rooms, water services, fire suppression and incoming meet-me rooms.

MEZZANINE FLOOR

Mechanical and electrical rooms and distribution.

SECOND FLOOR

Data halls and circulation.

ROOF

Flexible design to accommodate several mechanical cooling solutions.

  • Lead designers for fit-out
  • BREEAM
  • Acoustics
  • CFD modelling
  • Planning support
  • Full MEP
  • Utility delivery management and coordination
  • Site logistics planning
  • Landlords amendments and approval and AFL review
  • Sub tenant technical monitoring
  • IST authors